How To Fix FMCU131 - Activating multi-level BS in FM area &1 FY &2 is not allowed


FMCU131 - Overview

  • Message type: E = Error

  • Message class: FMCU - Customizing for budgeting in FM

  • Message number: 131

  • Message text: Activating multi-level BS in FM area &1 FY &2 is not allowed

  • Show details Hide details
  • What causes this issue?

    A flat budget structure has been assigned to FM area &v1& and fiscal
    year &v2& in global or version level in IMG activity
    <DS:SIMG._ISPSFM_VC_FMBSCONTR>Define Settings for the Budget Structure
    </>. This means you cannot activate the multi-level budget structure in
    FM area &v1& and fiscal year &v2&.

    System Response

    Processing stops.

    How to fix this error?

    Access IMG activity <DS:SIMG._ISPSFM_VC_FMBSCONTR>Define Settings for
    the Budget Structure</> and delete the entries that have assigned flat
    budget structure to FM area &v1& and fiscal year &v2& at global or
    version level.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FMCU131 - Activating multi-level BS in FM area &1 FY &2 is not allowed ?
    The SAP error message FMCU131 indicates that there is an issue with activating multi-level budget control in a specific Funds Management (FM) area and fiscal year. This error typically arises when the system settings or configurations do not allow for the activation of multi-level budget control for the specified FM area and fiscal year.
    
    Cause: Configuration Settings: The FM area may not be configured to allow multi-level budget control. This can happen if the settings in the Funds Management configuration do not support this feature. Fiscal Year Settings: The fiscal year specified may not be set up correctly for multi-level budget control. Budget Control Level: The budget control level may not be compatible with the multi-level budget control settings. Existing Budget Control: There may already be a budget control level activated that conflicts with the multi-level budget control.
    Solution: Check Configuration: Go to the Funds Management configuration settings in SAP (transaction code SPRO). Navigate to the relevant settings

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker