Do you have any question about this error?
Message type: E = Error
Message class: FMAVC - Message class AVC funds management
Message number: 264
Message text: Arithmetic error during evaluation of AVC data
An arithmetic error, probably an overflow, occurred during the
evaluation of AVC data.
Processing stops.
You have entered the value &V1& into the field
<DS:DE.BUAVC_RELLIMIT>Maximum Usage Rate</>. If this value is higher
than 100, try to restart the transaction with a lower value.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
FMAVC264
- Arithmetic error during evaluation of AVC data ?The SAP error message FMAVC264, which states "Arithmetic error during evaluation of AVC data," typically occurs in the context of the Availability Control (AVC) functionality in SAP. This error can arise due to various reasons related to the configuration or data inconsistencies in the system.
Causes:
- Data Inconsistencies: There may be inconsistencies in the data being processed, such as incorrect or missing values in the budget, actuals, or commitments.
- Division by Zero: The error may occur if there is an attempt to perform a division operation where the divisor is zero.
- Incorrect Configuration: The AVC settings or parameters may not be configured correctly, leading to unexpected calculations.
- Currency Issues: If there are currency conversion issues or mismatches, it can lead to arithmetic errors.
- Overflow Errors: If the values being processed exceed the limits of the data types used in calculations, it can result in overflow errors.
Solutions:
- Check Data Consistency: Review the budget, actuals, and commitments for the relevant cost centers, internal orders, or projects to ensure that all values are correctly entered and consistent.
- Review AVC Configuration: Verify the configuration settings for Availability Control in the relevant controlling area. Ensure that all necessary parameters are set correctly.
- Debugging: If you have access to debugging tools, you can trace the execution of the AVC logic to identify where the arithmetic error is occurring.
- Check for Division by Zero: Look for any calculations that may involve division and ensure that the divisor is not zero.
- Currency Settings: Ensure that currency settings are correctly configured and that there are no mismatches in currency types.
- SAP Notes: Check the SAP Support Portal for any relevant SAP Notes or patches that may address this specific error. Sometimes, known issues are documented with recommended solutions.
Related Information:
KOB1
(for actual line items) or CJI3
(for project actual line items) to analyze the data related to the error.If the issue persists after trying the above solutions, it may be necessary to involve your SAP Basis or technical team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
FMAVC263
Accepted ledger values are '9H' and '9I' only
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FMAVC262
Enter a valid value for the year of cash effectivity
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FMAVC265
Missing authorization for displaying some FM account assignments
What causes this issue? You have no authorization to display data of at least one of the selected control objects.System Response If you have no aut...
FMAVC266
No data available for your entries (missing authorization)
What causes this issue? The system found data matching your selection, but you are not authorized to display it.System Response The system could not...
Click on this link to search all SAP messages.