How To Fix FINS_ACDOC_PLANNING132 - CO_OSL is only allowed for WBS elements with a project currency defined.


FINS_ACDOC_PLANNING132 - Overview

  • Message type: E = Error

  • Message class: FINS_ACDOC_PLANNING - Messages for Package FINS_ACDOC_PLANNING

  • Message number: 132

  • Message text: CO_OSL is only allowed for WBS elements with a project currency defined.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FINS_ACDOC_PLANNING132 - CO_OSL is only allowed for WBS elements with a project currency defined. ?
    The SAP error message FINS_ACDOC_PLANNING132 indicates that the system has encountered an issue related to the use of a specific currency for a Work Breakdown Structure (WBS) element in project planning. The error specifically states that the cost object (in this case, a WBS element) is only allowed for WBS elements that have a project currency defined.
    
    Cause: Missing Project Currency: The WBS element you are trying to use does not have a project currency defined. In SAP, each project can have a specific currency, and if this is not set up correctly, you will encounter this error. Incorrect Configuration: The project settings may not be configured properly, leading to the absence of a defined currency for the WBS element. Data Entry Error: There may be a mistake in the data entry where the WBS element is being referenced without the necessary currency settings.
    Solution: Check WBS Element Settings: Go to the WBS element in question and

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant