How To Fix FINS_ACDOC_PLANNING131 - Project &1 hasn't project currency defined: Amount CO_OSL is not allowed.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FINS_ACDOC_PLANNING - Messages for Package FINS_ACDOC_PLANNING

  • Message number: 131

  • Message text: Project &1 hasn't project currency defined: Amount CO_OSL is not allowed.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FINS_ACDOC_PLANNING131 - Project &1 hasn't project currency defined: Amount CO_OSL is not allowed. ?

    The SAP error message FINS_ACDOC_PLANNING131 indicates that a project (identified by &1) does not have a defined project currency, which is causing an issue when trying to post an amount (CO_OSL) related to that project. This error typically arises in the context of project system (PS) or controlling (CO) modules when dealing with planning or actual postings.

    Cause:

    1. Missing Project Currency: The project in question has not been assigned a currency. Every project in SAP should have a defined currency to ensure that all financial transactions related to that project are recorded in a consistent manner.
    2. Configuration Issues: There may be a configuration issue in the project settings or in the controlling area settings that prevents the currency from being defined.
    3. Data Entry Errors: There could be a mistake in the data entry process where the project was created or modified without specifying the currency.

    Solution:

    1. Define Project Currency:

      • Go to the Project Definition in the Project System (transaction code CJ02).
      • Check the project settings and ensure that a currency is defined for the project.
      • If the currency is missing, you can add it in the project definition.
    2. Check Project Settings:

      • Ensure that the project is correctly configured in the system. This includes checking the controlling area settings and ensuring that the project is assigned to the correct controlling area.
    3. Review Configuration:

      • If you have the necessary authorizations, review the configuration settings in the controlling area (transaction code OKKP) to ensure that the currency settings are correct.
    4. Consult Documentation:

      • Refer to SAP documentation or help resources for additional guidance on project currency settings and related configuration.
    5. Contact SAP Support:

      • If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.

    Related Information:

    • Transaction Codes:
      • CJ02: Change Project
      • CJ03: Display Project
      • OKKP: Controlling Area Settings
    • SAP Notes: Check for any relevant SAP Notes that might address this specific error or provide additional troubleshooting steps.
    • User Authorizations: Ensure that the user has the necessary authorizations to make changes to project definitions and currency settings.

    By following these steps, you should be able to resolve the error and ensure that the project has a defined currency for future transactions.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant