How To Fix FINS_ACDOC_PLANNING130 - CO object currency of WBS element &3 (RCO_OCUR) isn't &1. Please use &2.


FINS_ACDOC_PLANNING130 - Overview

  • Message type: E = Error

  • Message class: FINS_ACDOC_PLANNING - Messages for Package FINS_ACDOC_PLANNING

  • Message number: 130

  • Message text: CO object currency of WBS element &3 (RCO_OCUR) isn't &1. Please use &2.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FINS_ACDOC_PLANNING130 - CO object currency of WBS element &3 (RCO_OCUR) isn't &1. Please use &2. ?
    The SAP error message FINS_ACDOC_PLANNING130 indicates that there is a mismatch between the currency of a Work Breakdown Structure (WBS) element and the expected currency for a particular operation. This error typically arises in the context of planning and budgeting in SAP, particularly when dealing with project systems (PS) and controlling (CO).
    
    Cause: The error message is triggered when: The currency of the WBS element (identified by &3) does not match the expected currency (&1) for the operation being performed. The system expects a specific currency for the planning or budgeting process, but the WBS element is set up with a different currency. This can happen if the WBS element was created with a different currency or if there are inconsistencies in the configuration of the project or controlling area.
    Solution: To resolve this error, you can take the following steps: Check WBS Element Currency: Go to the WBS element in question and check its currency settings. You can

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author