How To Fix FINOC029 - Transferring WIP documents for company code &1 and ledger &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FINOC - Organizational Changes: Backend Messages

  • Message number: 029

  • Message text: Transferring WIP documents for company code &1 and ledger &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FINOC029 - Transferring WIP documents for company code &1 and ledger &2 ?
    The SAP error message FINOC029 indicates an issue with transferring Work in Progress (WIP) documents for a specific company code and ledger. This error typically arises during the period-end closing process when the system attempts to transfer WIP amounts from the production order to the financial accounting (FI) module.
    
    Cause: The error can be caused by several factors, including: Missing or Incorrect Configuration: The configuration settings for WIP accounting may not be set up correctly in the system. Open Periods: The financial period may be closed, preventing the transfer of WIP documents. Data Inconsistencies: There may be inconsistencies in the data related to the production orders or WIP calculations. Authorization Issues: The user may not have the necessary authorizations to perform the transfer. Technical Issues: There could be technical issues or bugs in the system that are preventing the transfer.
    Solution: To resolve the FINOC029 error, you can take the following steps: Check Configuration: Ensure that the WIP configuration is correctly

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant