Message type: E = Error
Message class:  FCO_AVC_CC - Availability Control: Cost Centers 
Message number: 100
Message text: ---------- Plan Data Checks ----------
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message FCO_AVC_CC100 is related to the Advanced Variant Configuration (AVC) in SAP, specifically during the planning phase. This error typically indicates that there are issues with the configuration of the product or the planning data that needs to be addressed.
Cause: The error can arise due to several reasons, including but not limited to: Missing or Incorrect Configuration: The configuration of the product may be incomplete or incorrect, leading to inconsistencies in the planning data. Data Inconsistencies: There may be inconsistencies in the master data or transaction data that are being used for planning. Invalid Dependencies: The dependencies defined in the variant configuration may not be valid or may not be satisfied by the current configuration. Planning Parameters: Incorrect planning parameters or settings in the planning profile can also lead to this error.
Solution: To resolve the FCO_AVC_CC100 error, you can take the following steps: Check Configuration: Review the configuration of the product in question. Ensure
 Get instant SAP help. Sign up for our Free Essentials Plan.
Get instant SAP help. Sign up for our Free Essentials Plan. 
FCO_AVC_CC014 Availability control is active and "Lock Commitment Updates" is enabled.
What causes this issue?  The budget availability control is either active for this cost center or this cost center is assigned to a budget-carrying co...
FCO_AVC_CC013 Tolerance limit of &2% for cost center &1 has been reached in FY &3.
What causes this issue?  If you change the cost center, the budget tolerance limit of &V2&% for cost center &V1& in fiscal year &V...
FCO_AVC_CC102 Tolerance limit of &2% for cost center &1 has been reached in FY &3.
What causes this issue?  If you change the budget for cost center &V1& in fiscal year &V3&, the budget tolerance limit of &V2&...
ESH_HANA_ADMIN240 Could not determine fulltext indices for table &1.&2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.