Message type: E = Error
Message class: FCO_AVC_CC - Availability Control: Cost Centers
Message number: 013
Message text: Tolerance limit of &2% for cost center &1 has been reached in FY &3.
If you change the cost center, the budget tolerance limit of &V2&% for
cost center &V1& in fiscal year &V3& for the account group &V4& would be
exceeded.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
FCO_AVC_CC013
- Tolerance limit of &2% for cost center &1 has been reached in FY &3. ?The SAP error message FCO_AVC_CC013 indicates that a tolerance limit for a cost center has been reached in a specific fiscal year. This message is part of the Availability Control (AVC) functionality in SAP, which is used to monitor and control budget consumption against predefined limits.
Cause: The error occurs when the actual costs or commitments for a cost center exceed the defined tolerance limit (in this case, &2%) for a specific fiscal year (&3). This is a safeguard to prevent overspending beyond the budgeted amounts.
Solution: To resolve this error, you can consider the following steps: Review Tolerance Limits: Check the tolerance limits set for the cost center in question. You can do this by navigating to the configuration settings in SAP for Availability Control. If necessary, adjust the tolerance limits to allow for higher spending. This can be done by modifying the settings in the controlling area. Analyze Cost Center Activity: Review the actual costs and commitments
Get instant SAP help. Sign up for our Free Essentials Plan.
FCO_AVC_CC012
Chart of accounts hierarchy differs for cost center &1 and profile.
What causes this issue? Cost center &V1& references chart of accounts &V2& and the assigned budget availability control profile, with...
FCO_AVC_CC011
Cost center &1 references cost center &2, which isn't budget-carrying.
What causes this issue? Cost center &V2& is specified as the budget-carrying cost center for cost center &V1&. However, cost center &...
FCO_AVC_CC014
Availability control is active and "Lock Commitment Updates" is enabled.
What causes this issue? The budget availability control is either active for this cost center or this cost center is assigned to a budget-carrying co...
FCO_AVC_CC100
---------- Plan Data Checks ----------
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.