How To Fix FARR_CONTRACT_MAIN299 - Time-base POB &1 cannot be defined as start date type 3 and event type CI


FARR_CONTRACT_MAIN299 - Overview

  • Message type: E = Error

  • Message class: FARR_CONTRACT_MAIN - Revenue Accounting: Contract Management

  • Message number: 299

  • Message text: Time-base POB &1 cannot be defined as start date type 3 and event type CI

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FARR_CONTRACT_MAIN299 - Time-base POB &1 cannot be defined as start date type 3 and event type CI ?
    The SAP error message FARR_CONTRACT_MAIN299 indicates an issue related to the configuration of time-based POB (Point of Billing) in the context of contract management. Specifically, it suggests that a certain POB cannot be defined with a start date type of 3 (which typically indicates a specific type of date handling) and an event type of CI (which usually refers to a specific event type in the contract lifecycle).
    
    Cause: Incompatible Configuration: The error arises when there is a mismatch between the start date type and the event type. In this case, the system does not allow the combination of start date type 3 with event type CI. Incorrect Master Data: The master data for the contract or POB may not be set up correctly, leading to this conflict. Business Rules: There may be specific business rules or constraints defined in the system that prevent this combination from being valid.
    Solution: Review Configuration: Check the configuration settings

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author