Do you have any question about this error?
Message type: E = Error
Message class: FARR_CONTRACT_MAIN - Revenue Accounting: Contract Management
Message number: 087
Message text: Changing POB &1 from non-distinct to distinct is not permitted
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
FARR_CONTRACT_MAIN087
- Changing POB &1 from non-distinct to distinct is not permitted ?The SAP error message FARR_CONTRACT_MAIN087 indicates that there is an issue with changing the status of a Profitability Object (POB) from non-distinct to distinct in the context of contract management. This error typically arises in the SAP system when there is an attempt to modify the characteristics of a Profitability Object that is not allowed due to the existing configuration or data integrity rules.
Cause:
- Data Integrity Rules: The system enforces rules to maintain data integrity. Changing a POB from non-distinct to distinct may violate these rules, especially if there are existing transactions or data linked to the POB.
- Configuration Settings: The configuration settings in the SAP system may not allow for such changes. This could be due to the way the POBs are defined in the system.
- Existing Dependencies: There may be existing dependencies or relationships with other objects or transactions that prevent the change.
Solution:
- Review Configuration: Check the configuration settings for the Profitability Object in the SAP system. Ensure that the settings allow for the desired changes.
- Data Cleanup: If there are existing transactions or data linked to the POB, you may need to clean up or adjust these before attempting to change the POB status.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on handling Profitability Objects and the implications of changing their status.
- Use Transaction Codes: Utilize relevant transaction codes (like
FARR
for contract management) to review the current status and dependencies of the POB.- Seek Support: If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert who can provide insights based on your specific system configuration and data.
Related Information:
FARR
(Contract Management) and KE30
(Profitability Analysis).By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
FARR_CONTRACT_MAIN086
Contract &1 deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FARR_CONTRACT_MAIN085
Changing perf. oblig. &1 from compound to distinct is not permitted
What causes this issue? You have attempted to change a performance obligation from compound to distinct. However, this change is not allowed for lead...
FARR_CONTRACT_MAIN088
Not authorized to delete initial load data (co.code &1, acct.princpl. &2)
What causes this issue? You are not authorized to clean up leftover data that was generated by a previous initial load job. This authorization is che...
FARR_CONTRACT_MAIN089
Performance obligation &2 cannot include reserved condition type &1
What causes this issue? When creating or updating a performance obligation, the back-end operational system (the system that originates the performan...
Click on this link to search all SAP messages.