How To Fix FAGL_SWITCH_OP070 - Balance of ledger &1, company code &2 is not zero; see long text


FAGL_SWITCH_OP070 - Overview

  • Message type: E = Error

  • Message class: FAGL_SWITCH_OP -

  • Message number: 070

  • Message text: Balance of ledger &1, company code &2 is not zero; see long text

  • Show details Hide details
  • What causes this issue?

    Prior to the switch to open item management, the system performed
    transfer postings that set the balance to zero for each ledger,
    currency, and account assignment. Although the written-off amounts are
    posted back again, they are nevertheless posted back to the default
    account assignments that were previously entered on the selection
    screen. The check explicitly excludes these account assignments.
    Consequently, the balances on all other account assignments need to be
    cleared.

    System Response

    This is not necessarily an error because it is possible that, within the
    posting interface, processes are run that derive, supplement, or change
    the account assignments. (An example of such a process would be
    derivation rules.)
    The switch to open item management for the account has already been made
    for this point in time. The system only performs closing checks.

    How to fix this error?

    Check the account (balances, open items, clearing).
    If you conclude that an error has indeed occurred, contact SAP.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FAGL_SWITCH_OP070 - Balance of ledger &1, company code &2 is not zero; see long text ?
    The SAP error message FAGL_SWITCH_OP070 indicates that the balance of a specific ledger for a given company code is not zero, which is a requirement for certain operations, such as switching to a new ledger or performing year-end closing activities. This error typically arises in the context of the New General Ledger (New GL) functionality in SAP.
    
    Cause: Uncleared Transactions: There may be open items or transactions in the ledger that have not been cleared or settled. Incorrect Configuration: The ledger or company code may not be properly configured, leading to discrepancies in balances. Pending Postings: There could be pending postings that have not been processed, affecting the balance. Data Migration Issues: If data was migrated from an older system, there may be inconsistencies in the balances.
    Solution: Check Open Items: Use transaction code FBL3N (for G/L accounts) or FBL1N (for vendor accounts) to review open items in the ledger. Clear any outstanding items as necessary. Reconcile Balances:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant