Do you have any question about this error?
Message type: E = Error
Message class: FAGL_SWITCH_LEAD_LDG - Technical Changeover of Leading View in General Ledger (New)
Message number: 206
Message text: &1: Lock is activated
Performing the activity set the indicator (the posting block for) "&V1&
".
<ZH>The system now blocks the postings mentioned above.</> For more
information, see the documentation for the indicator:
<DS:DE.FAGL_SLL_XPOST_CHECK_NEW>Ledger-Specific Postings to Switch Year
</>
<DS:DE.FAGL_SLL_XPOST_CHECK_OLD>Ledger-Specific Postings to Year Prior
to Switch</>
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
FAGL_SWITCH_LEAD_LDG206
- &1: Lock is activated ?The SAP error message FAGL_SWITCH_LEAD_LDG206 indicates that a lock is activated for the leading ledger in the General Ledger Accounting (FI-GL) module. This typically occurs when there are ongoing processes or configurations that prevent changes to the leading ledger.
Cause:
- Active Processes: There may be ongoing transactions or processes that are currently using the leading ledger, such as posting documents, running reports, or executing batch jobs.
- Configuration Settings: The system may have specific configuration settings that lock the ledger during certain operations, such as closing periods or executing year-end processes.
- User Locks: A user may have a lock on the ledger due to an open session or transaction that has not been completed.
Solution:
- Check Active Processes: Review any active transactions or processes that may be using the leading ledger. Ensure that all necessary transactions are completed before attempting to make changes.
- Review Configuration: Check the configuration settings in the system to see if there are any locks set for the leading ledger. This can include period closing settings or other related configurations.
- User Sessions: Verify if there are any user sessions that are holding locks on the ledger. If necessary, log off or terminate those sessions.
- Wait for Completion: If the lock is due to a background job or process, you may need to wait for that process to complete before proceeding.
- Consult with Basis Team: If the issue persists, consult with your SAP Basis team to check for any system-level locks or issues that may be affecting the ledger.
Related Information:
SM12
to check for user locks and SM37
to monitor background jobs.If the problem continues after following these steps, it may be necessary to escalate the issue to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
FAGL_SWITCH_LEAD_LDG205
Project status was changed; new status: &2
What causes this issue? An activity was carried out that resulted in a predefined status being reached during the course of the switch project. This ...
FAGL_SWITCH_LEAD_LDG204
This step is not required in the current status
What causes this issue? The status of the switch project is already "&V1&". However, the step performed is only required to reach a...
FAGL_SWITCH_LEAD_LDG207
&1: Lock is deactivated
What causes this issue? Performing the activity removed the indicator (the posting block for) " &V1&".System Response <ZH>Th...
FAGL_SWITCH_LEAD_LDG208
&1: possible
What causes this issue? When the activity was executed, the "&V1&" indicator was set. This means that these postings are now possib...
Click on this link to search all SAP messages.