Message type: E = Error
Message class: FAGL_SWITCH_LEAD_LDG - Technical Changeover of Leading View in General Ledger (New)
Message number: 205
Message text: Project status was changed; new status: &2
An activity was carried out that resulted in a predefined status being
reached during the course of the switch project. This status switch
enables the next activity in the process flow to be carried out. For
more information, see SAP Library under <LS>General Ledger Accounting
(FI-GL) </>-> <LS>Configuring General Ledger Accounting </>-> <LS>
Parallel Accounting </>-> <LS>Portrayal Using Parallel Ledgers </>->
<LS>Change in Leading Valuation </>-> <LS>Process Flow of Switch Project
</>.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message FAGL_SWITCH_LEAD_LDG205 indicates that the status of a project has been changed, and it provides information about the new status. This message typically arises in the context of financial accounting and project management within SAP, particularly when dealing with the General Ledger (G/L) and project-related transactions.
Cause: The error message FAGL_SWITCH_LEAD_LDG205 is triggered when there is a change in the status of a project that affects the financial postings or the way the project is managed in the system. This could happen due to various reasons, such as: Project Status Change: The project status was manually changed by a user or through a batch job, which may affect the ability to post transactions to that project. Configuration Changes: Changes in the project configuration or settings that impact how the project is treated in the financial system. Authorization Issues: Users may not have the necessary authorizations to post to a project that has
Get instant SAP help. Sign up for our Free Essentials Plan.
FAGL_SWITCH_LEAD_LDG204 This step is not required in the current status
What causes this issue? The status of the switch project is already "&V1&". However, the step performed is only required to reach a...
FAGL_SWITCH_LEAD_LDG203 Activity was not performed successfully; see message log
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FAGL_SWITCH_LEAD_LDG206 &1: Lock is activated
What causes this issue? Performing the activity set the indicator (the posting block for) "&V1& ".System Response <ZH>The sy...
FAGL_SWITCH_LEAD_LDG207 &1: Lock is deactivated
What causes this issue? Performing the activity removed the indicator (the posting block for) " &V1&".System Response <ZH>Th...
Click on this link to search all SAP messages.