Do you have any question about this error?
Message type: E = Error
Message class: EL - IS-U meter reading data processing
Message number: 457
Message text: Device &1, MR date &2: MR date &3 not identical to scheduled MR date &4
When you enter meter reading results for certain meter reading reasons,
the meter reading date may not deviate from the scheduled meter reading
date. This applies to move-in/out readings, for example.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If you want to enter move-in/out readings, determine whether the date
of the move-in or move-out must be moved.
Error message extract from SAP system. Copyright SAP SE.
EL457
- Device &1, MR date &2: MR date &3 not identical to scheduled MR date &4 ?The SAP error message EL457 indicates a mismatch between the material requirements (MR) date and the scheduled MR date for a specific device. This error typically arises in the context of production planning or materials management when there is a discrepancy in the dates that are expected versus what is actually recorded in the system.
Cause:
- Date Mismatch: The MR date specified for a device does not match the scheduled MR date in the system. This can happen due to manual entry errors, changes in production schedules, or updates to the planning data that were not reflected in the MR date.
- Configuration Issues: There may be issues with the configuration of the planning parameters or settings in the system that lead to inconsistencies in date management.
- Data Updates: If there have been recent changes to the production plan or material requirements that have not been properly synchronized, this error can occur.
Solution:
- Verify Dates: Check the MR date and the scheduled MR date for the device in question. Ensure that they are indeed supposed to be the same. If they are not, update the MR date to match the scheduled date or vice versa, depending on the business requirements.
- Review Planning Data: Look into the planning data for the device to ensure that all relevant information is consistent and up to date. This includes checking for any recent changes that may not have been reflected in the MR date.
- Adjust Configuration: If the issue is related to configuration settings, consult with your SAP configuration team to ensure that the planning parameters are set correctly.
- Reprocess the Planning Run: If necessary, reprocess the planning run to ensure that all dates and requirements are recalculated and synchronized.
- Consult Documentation: Refer to SAP documentation or help resources for further insights into the specific error message and any additional troubleshooting steps that may be relevant.
Related Information:
By following these steps, you should be able to identify the cause of the EL457 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
EL456
Do not schedule meter reading allocation date after &1
What causes this issue? Allocation date for meter readingSystem Response This date is used during billing and preliminary demand processing for allo...
EL455
Schedule allocation date between &1 and &2
What causes this issue? Allocation date for meter readingSystem Response This date is used during billing and preliminary demand processing for allo...
EL458
Device &1, register &2: Another MR unit is valid for this MR date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
EL459
Device &1, reg. &2, MR date &3: An MR result alr. exists for MR date &4
What causes this issue? A meter reading result already exists for a same day on which a billing order also exists. This is not allowed and causes an ...
Click on this link to search all SAP messages.