Do you have any question about this error?
Message type: E = Error
Message class: EL - IS-U meter reading data processing
Message number: 456
Message text: Do not schedule meter reading allocation date after &1
Allocation date for meter reading
This date is used during billing and preliminary demand processing for
allocating the meter reading result to a month. The date is assigned
chronologically. For example, if demand is entered on 04/29/1999, you
can use an allocation date so that the allocation takes place in May
(05/05/1999). The result is allocated to a season via the day and the
month of the allocation date. For example, a meter reading with
allocation date 06/17/1998 takes place during the summer period, from
06/15/1998 to 09/15/1998. You define the season via a season-dependent
operand in the facts or the rate.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
EL456
- Do not schedule meter reading allocation date after &1 ?The SAP error message EL456, which states "Do not schedule meter reading allocation date after &1," typically occurs in the context of meter reading and allocation processes in SAP IS-U (Industry Solution for Utilities). This error indicates that the date you are trying to schedule for meter reading allocation is beyond a certain limit, which is defined by the system.
Cause:
- Date Constraint: The error is triggered when the scheduled meter reading allocation date exceeds the last possible date for allocation, which is usually defined by the system settings or business rules.
- Configuration Settings: There may be configuration settings in the SAP system that restrict the scheduling of meter readings to a certain timeframe.
- Business Logic: The business process may dictate that meter readings must be allocated within a specific period relative to the billing cycle or other operational constraints.
Solution:
- Check the Date: Review the date you are trying to schedule for the meter reading allocation. Ensure that it is within the acceptable range defined by the system.
- Adjust Scheduling: If the date is indeed after the allowed date, adjust it to a valid date that is within the permissible range.
- Review Configuration: If you believe the date should be valid, check the configuration settings in the SAP system related to meter reading allocation. This may involve consulting with your SAP Basis or IS-U configuration team.
- Consult Documentation: Refer to the SAP documentation or help files for specific details on the date constraints for meter reading allocations.
- Contact Support: If the issue persists and you cannot identify the cause, consider reaching out to SAP support or your internal IT support team for further assistance.
Related Information:
By following these steps, you should be able to resolve the EL456 error and successfully schedule your meter reading allocation.
Get instant SAP help. Start your 7-day free trial now.
EL455
Schedule allocation date between &1 and &2
What causes this issue? Allocation date for meter readingSystem Response This date is used during billing and preliminary demand processing for allo...
EL454
Enter an allocation date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
EL457
Device &1, MR date &2: MR date &3 not identical to scheduled MR date &4
What causes this issue? When you enter meter reading results for certain meter reading reasons, the meter reading date may not deviate from the sched...
EL458
Device &1, register &2: Another MR unit is valid for this MR date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.