Do you have any question about this error?
Message type: E = Error
Message class: ECM - General Messages for Engineering Change Management
Message number: 520
Message text: ECO & is already assigned to ECR &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
ECM520
- ECO & is already assigned to ECR & ?The SAP error message ECM520 typically indicates that an Engineering Change Order (ECO) is already assigned to an Engineering Change Request (ECR). This situation arises when there is an attempt to assign an ECO to an ECR that has already been linked to another ECO, which is not allowed in the system.
Cause:
- Duplicate Assignment: The ECO you are trying to assign is already linked to a different ECR.
- Incorrect Workflow: The workflow process may not have been followed correctly, leading to an attempt to assign an ECO that is already in use.
- Data Integrity Issues: There may be issues with data integrity in the system, such as incorrect records or incomplete transactions.
Solution:
- Check Existing Assignments: Review the existing assignments of the ECO and ECR in the system. You can do this by navigating to the relevant transaction codes (like
CC01
for creating ECOs orCC02
for changing them) and checking the relationships.- Unassign the ECO: If the ECO is incorrectly assigned to another ECR, you may need to unassign it from that ECR before you can assign it to the desired one.
- Create a New ECO: If the ECO is already in use and cannot be unassigned, consider creating a new ECO for the changes you want to implement.
- Consult Documentation: Refer to SAP documentation or your organization's internal guidelines for managing ECOs and ECRs to ensure compliance with the process.
- Contact Support: If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
CC01
, CC02
, CC03
(for ECO management) and CC11
, CC12
, CC13
(for ECR management).By following these steps, you should be able to address the ECM520 error and ensure proper management of your ECOs and ECRs in SAP.
Get instant SAP help. Start your 7-day free trial now.
ECM519
No display authorization for &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
ECM518
Engineering change request & not found in database
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
ECM521
Not authorized to areate an engineering change order
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
ECM522
Not authorized to create an engineering change order
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.