How To Fix EBR428 - PI sheet &1 is not complete or technically complete


EBR428 - Overview

  • Message type: E = Error

  • Message class: EBR - Message Class for Batch Records

  • Message number: 428

  • Message text: PI sheet &1 is not complete or technically complete

  • Show details Hide details
  • INCLUDE EBR505 OBJECT DOKU ID NA LANGUAGE EN

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message EBR428 - PI sheet &1 is not complete or technically complete ?
    The SAP error message EBR428 indicates that a Process Instruction (PI) sheet is either not complete or not technically complete. This error typically arises in the context of production planning and execution, particularly when working with process orders in the SAP system.
    
    Cause: Incomplete Data: The PI sheet may be missing required information, such as materials, quantities, or instructions that are necessary for the production process. Technical Completeness: The PI sheet may not have been marked as technically complete. This means that the system has not validated all the necessary data and configurations for the PI sheet to be considered ready for use. Status Issues: The PI sheet might be in a status that does not allow it to be processed further, such as being in a draft state or not released.
    Configuration Issues: There may be issues with the configuration of the PI sheet or the related master data, such as recipes or production

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker