Do you have any question about this error?
Message type: E = Error
Message class: E9 - General IS-U Error Messages
Message number: 249
Message text: Day capacity updated for &1 service area &2 region &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
E9249
- Day capacity updated for &1 service area &2 region &3 ?The SAP error message E9249 typically indicates an issue related to the capacity planning or resource allocation for a specific service area and region. This message is often encountered in the context of SAP's Advanced Planning and Optimization (APO) or similar modules where capacity management is crucial.
Cause:
The error message E9249 can be triggered by several factors, including:
- Capacity Overload: The planned capacity for a service area may exceed the available capacity, leading to an inability to allocate resources effectively.
- Configuration Issues: Incorrect configuration settings in the service area or region can lead to discrepancies in capacity planning.
- Data Inconsistencies: Inconsistent or missing data related to capacity, such as shifts, working hours, or resource availability, can cause this error.
- Planning Version Issues: If the planning version is not correctly set or if there are issues with the versioning of the data, it may lead to this error.
Solution:
To resolve the E9249 error, consider the following steps:
- Check Capacity Settings: Review the capacity settings for the service area and region in question. Ensure that the available capacity is sufficient to meet the planned demand.
- Review Configuration: Verify the configuration of the service area and region in the system. Ensure that all necessary parameters are correctly set.
- Data Validation: Check for any inconsistencies or missing data in the capacity planning tables. Ensure that all relevant data, such as shifts and resource availability, is correctly entered.
- Adjust Planning Versions: If applicable, ensure that the correct planning version is being used and that it is up to date.
- Run Capacity Planning: After making adjustments, run the capacity planning process again to see if the error persists.
- Consult Documentation: Refer to SAP documentation or support notes related to this error message for additional insights and troubleshooting steps.
Related Information:
/SAPAPO/MC90
for capacity planning or /SAPAPO/CC01
for creating capacity constraints.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who specializes in SAP APO or the specific module you are working with.
Get instant SAP help. Start your 7-day free trial now.
E9248
Day capacity created for &1 serv. area &2 region &3 with &4 routes
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
E9247
Day capacity for &1 serv. area &2 region &3 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
E9250
You are not authorized for object &1 (activity &2, reg. struct. group &3)
What causes this issue? You have no authorization for the regional structure group specified. This regional structure group was determined for one of...
E9251
No free capacity found in the future
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.