How To Fix E9251 - No free capacity found in the future


SAP Error Message - Details

  • Message type: E = Error

  • Message class: E9 - General IS-U Error Messages

  • Message number: 251

  • Message text: No free capacity found in the future

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message E9251 - No free capacity found in the future ?

    The SAP error message E9251 "No free capacity found in the future" typically occurs in the context of production planning and capacity management. This error indicates that the system cannot find available capacity for a specific resource (like a machine or work center) for the planned production orders or operations in the future.

    Causes:

    1. Capacity Overload: The planned production exceeds the available capacity of the work center or resource.
    2. Incorrect Planning Parameters: The planning parameters (like lead times, production quantities, etc.) may not be set correctly, leading to unrealistic scheduling.
    3. Resource Availability: The resource may be booked for maintenance, holidays, or other reasons, leading to no available capacity.
    4. Incorrect Master Data: Issues with the master data of the work center, such as incorrect capacity settings or calendar settings.
    5. Planning Horizon: The planning horizon may not be set correctly, causing the system to look for capacity beyond what is available.

    Solutions:

    1. Check Capacity Planning: Review the capacity planning for the relevant work centers. Ensure that the available capacity is sufficient for the planned production.
    2. Adjust Production Schedule: If possible, adjust the production schedule to align with available capacity. This may involve rescheduling orders or changing production quantities.
    3. Review Resource Availability: Check if the resource is available during the planned production period. If it is not, consider rescheduling or using alternative resources.
    4. Update Master Data: Ensure that the master data for the work center is accurate, including capacity, shift patterns, and calendars.
    5. Increase Capacity: If feasible, consider increasing the capacity of the work center by adding shifts, overtime, or additional resources.
    6. Check Planning Horizon: Ensure that the planning horizon is set correctly in the system to include the necessary time frame for production.

    Related Information:

    • Transaction Codes: You can use transaction codes like CM01 (Capacity Planning) or CM21 (Capacity Leveling) to analyze and manage capacity issues.
    • Reports: Utilize reports such as S076 (Capacity Evaluation) to get insights into capacity utilization and availability.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.
    • Documentation: Refer to SAP documentation for detailed guidelines on capacity planning and production scheduling.

    By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the E9251 error and ensure that your production planning aligns with available capacity.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.