How To Fix DPR_SHARED253 - Maximum duration of 99999 days exceeded; adjust the start or end date


SAP Error Message - Details

  • Message type: E = Error

  • Message class: DPR_SHARED - Development Projects: Messages for Shared Objects

  • Message number: 253

  • Message text: Maximum duration of 99999 days exceeded; adjust the start or end date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_SHARED253 - Maximum duration of 99999 days exceeded; adjust the start or end date ?
    The SAP error message DPR_SHARED253 indicates that a project or task in the SAP Project Management module has a duration that exceeds the maximum allowable limit of 99,999 days. This typically occurs when the start and end dates of a project or task are set in such a way that the calculated duration exceeds this limit.
    
    Cause: Incorrect Date Entry: The start or end date of the project/task may have been entered incorrectly, leading to an unrealistic duration. Date Calculation Error: If the system is calculating the duration based on the dates provided, any discrepancies or errors in the date fields can lead to this issue. Project Planning Errors: In some cases, the project planning might not have been set up correctly, leading to unintended long durations.
    Solution: Check Dates: Review the start and end dates of the project or task. Ensure that they are set correctly and that the end date is not excessively far

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant