How To Fix DPR_SHARED234 - Top-down scheduling was carried out


DPR_SHARED234 - Overview

  • Message type: E = Error

  • Message class: DPR_SHARED - Development Projects: Messages for Shared Objects

  • Message number: 234

  • Message text: Top-down scheduling was carried out

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_SHARED234 - Top-down scheduling was carried out ?
    The SAP error message DPR_SHARED234, which states "Top-down scheduling was carried out," typically occurs in the context of project management within SAP, particularly when using the SAP Project System (PS) or SAP Portfolio and Project Management (PPM) modules. This message indicates that the system has performed a top-down scheduling process, which may not align with the user's expectations or the specific scheduling requirements of a project.
    
    Cause: Top-Down Scheduling: This occurs when the system schedules tasks based on the overall project timeline rather than individual task constraints. It can lead to conflicts if the project manager expects bottom-up scheduling, where tasks are scheduled based on their individual durations and dependencies. Project Settings: The project may be configured to use top-down scheduling as the default method, which can lead to this message if the user attempts to make changes that are incompatible with this method. Dependencies and Constraints: If there are dependencies or constraints set

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant