Do you have any question about this error?
Message type: E = Error
Message class: DPR_FIN_GECCO - Messages for Accounting Integration
Message number: 042
Message text: Costing takes place asynchronously; refresh is required if available
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
DPR_FIN_GECCO042
- Costing takes place asynchronously; refresh is required if available ?The SAP error message DPR_FIN_GECCO042 indicates that there is an asynchronous process related to costing that has not yet completed. This typically occurs in the context of project management and financial accounting within SAP, particularly when using the SAP Project System (PS) or SAP Portfolio and Project Management (PPM) modules.
Cause:
- Asynchronous Processing: The costing process is designed to run in the background to improve performance. If you try to access costing information before the process has completed, you will encounter this error.
- Data Locking: There may be data locks in place that prevent the costing process from completing.
- System Performance: High system load or performance issues can delay the completion of the costing process.
- Configuration Issues: Incorrect configuration settings in the costing or project management modules may lead to this error.
Solution:
- Refresh the Data: The simplest solution is to refresh the screen or the data. This can often be done by pressing the refresh button or using the F5 key in the SAP GUI.
- Wait for Completion: If the costing process is still running, wait for it to complete. You can check the status of background jobs in transaction SM37.
- Check for Locks: Use transaction SM12 to check for any locks that might be preventing the costing process from completing. If you find any locks that are no longer needed, you can delete them (with caution).
- Review Background Jobs: Check the status of background jobs related to costing in transaction SM37. If there are any failed jobs, investigate the logs for errors.
- System Performance: If the system is under heavy load, consider scheduling the costing processes during off-peak hours.
- Configuration Review: Review the configuration settings for costing in the project management module to ensure they are set up correctly.
Related Information:
If the issue persists after trying the above solutions, it may be necessary to consult with your SAP Basis or technical team for further investigation, as there may be underlying system issues that need to be addressed.
Get instant SAP help. Start your 7-day free trial now.
DPR_FIN_GECCO041
Cost/revenue rate &1: Change organizational unit 0 as required
What causes this issue? An entry is missing under <LS>Responsible Organization 0</> (default value) in Customizing for the cost/revenue r...
DPR_FIN_GECCO040
Cost/revenue rate &1: Organizational unit 0 is missing
What causes this issue? An entry is missing under <LS>Responsible Organization 0</> (default value) in Customizing for the cost/revenue r...
DPR_FIN_GECCO043
Costing is locked: Account assignment had to be reset
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_FIN_GECCO044
Costing data may not be up to date
What causes this issue? You made changes relevant to costing for data that has already been saved. However, the system could not update the costing (...
Click on this link to search all SAP messages.