Message type: E = Error
Message class: /CUM/CONMS -
Message number: 030
Message text: Check WBS element assignment! (CM assigned to different WBS element &1)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message /CUM/CONMS030 Check WBS element assignment! (CM assigned to different WBS element &1) typically occurs in the context of project management and cost management within SAP. This error indicates that there is a mismatch between the assigned Cost Management (CM) object and the Work Breakdown Structure (WBS) element in the system.
Cause: Incorrect Assignment: The cost management object (like a cost center, internal order, or project) is assigned to a WBS element that does not match the one expected by the system. Data Inconsistency: There may be inconsistencies in the master data where the cost management object is linked to a different WBS element than what is being referenced in the transaction.
Configuration Issues: There could be configuration settings in the project system that are not aligned with the current assignments of cost objects and WBS elements.
Solution: Verify Assignments: Check the assignment of the cost management object to the WBS element. Ensure
Get instant SAP help. Sign up for our Free Essentials Plan.
/CUM/CONMS029 WBS element &1 has been copied from contruction measure &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CUM/CONMS028 Construction measure & has a different CM type &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CUM/CONMS031 Construction measure & will be released after saving
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CUM/MSG000 & & & &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.