Message type: E = Error
Message class: /CUM/CONMS -
Message number: 031
Message text: Construction measure & will be released after saving
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message /CUM/CONMS031 typically relates to construction measures in the context of project management or construction management within SAP. This error indicates that a construction measure cannot be released until it has been saved properly. Here’s a breakdown of the cause, potential solutions, and related information:
Cause: Incomplete Data Entry: The construction measure may not have all the required fields filled out, preventing it from being saved and subsequently released. Status Issues: The construction measure might be in a status that does not allow it to be released. For example, it may be in a draft or incomplete state. Authorization Issues: The user may not have the necessary permissions to save or release the construction measure. System Configuration: There may be configuration settings in the SAP system that are preventing the release of the construction measure.
Solution: Check Data Completeness: Ensure that all mandatory fields in the construction measure are filled out correctly. Review the
Get instant SAP help. Sign up for our Free Essentials Plan.
/CUM/CONMS030 Check WBS element assignment! (CM assigned to different WBS element &1)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CUM/CONMS029 WBS element &1 has been copied from contruction measure &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CUM/MSG000 & & & &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CUM/MSG001 Valid from date may not fall after valid to date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.