Message type: E = Error
Message class: /CUM/CONMS -
Message number: 028
Message text: Construction measure & has a different CM type &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message /CUM/CONMS028 typically indicates that there is a mismatch in the construction measure (CM) type for a specific construction measure in the system. This error often arises in the context of project system (PS) or construction management modules where construction measures are used to track and manage project progress.
Cause: Mismatch in CM Types: The error usually occurs when the construction measure being referenced has a different type than what is expected or required for the operation being performed.
Configuration Issues: There may be configuration settings in the system that are not aligned with the construction measures being used. Data Entry Errors: Incorrect data entry or selection of construction measures that do not correspond to the expected types can lead to this error. Inconsistent Master Data: If the master data for construction measures is inconsistent or not properly maintained, it can lead to type mismatches.
Solution: Check Construction Measure Type: Verify the type of
Get instant SAP help. Sign up for our Free Essentials Plan.
/CUM/CONMS027 Construction measure & has status & and cannot be allocated to design
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CUM/CONMS026 Construction measure & does not exist. Enter a valid constr. measure
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CUM/CONMS029 WBS element &1 has been copied from contruction measure &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CUM/CONMS030 Check WBS element assignment! (CM assigned to different WBS element &1)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.