Message type: E = Error
Message class: CRMS4_PS_TOOLS - Message Class for Periods & Due Date Tools
Message number: 056
Message text: Factory calendar date cannot be determined for calendar &1 / date &2
Factory calendar date determination is not possible.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
A factory calendar is used to determine a factory date during due date
rule calculation. Check the due date rule used and the validity range of
the factory calendar.
Use the <LS>SAP Calendar</> transaction (SCAL) to check the validity of
the factory calendar used.
Error message extract from SAP system. Copyright SAP SE.
CRMS4_PS_TOOLS056
- Factory calendar date cannot be determined for calendar &1 / date &2 ?The SAP error message CRMS4_PS_TOOLS056 indicates that the system is unable to determine a factory calendar date for a specified calendar and date. This typically occurs in scenarios where date calculations are involved, such as scheduling or planning activities in SAP CRM or SAP PS (Project System).
Cause:
- Missing Factory Calendar: The specified factory calendar may not be defined in the system.
- Incorrect Date: The date provided may not fall within the valid range of the factory calendar.
- Calendar Assignment: The factory calendar may not be correctly assigned to the relevant organizational unit or project.
- Inactive Calendar: The factory calendar might be inactive or not properly configured.
- Time Zone Issues: There may be discrepancies due to time zone settings that affect date calculations.
Solution:
Check Factory Calendar Configuration:
- Go to the transaction code
SCAL
to check the factory calendar settings.- Ensure that the calendar is defined and active for the relevant period.
Verify Date Validity:
- Confirm that the date you are trying to use is valid and falls within the operational range of the factory calendar.
Assign Factory Calendar:
- Ensure that the factory calendar is correctly assigned to the relevant organizational unit or project. This can be checked in the project definition or in the settings of the relevant module.
Review Calendar Settings:
- Check if the factory calendar has any holidays or non-working days that might affect the date determination.
Check Time Zone Settings:
- Ensure that the time zone settings in your user profile and system settings are correctly configured.
Consult Documentation:
- Refer to SAP documentation or help resources for additional guidance on factory calendar configuration and troubleshooting.
Related Information:
Transaction Codes:
SCAL
- To manage factory calendars.CRMD_ORDER
- To check CRM order details.CJ20N
- To view project structures in Project System.SAP Notes:
User Roles:
If the issue persists after checking the above points, it may be beneficial to consult with your SAP Basis or functional team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
CRMS4_PS_TOOLS055
Minimum date (01.01.1900) reached; no further date decrease allowed
The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Procedure for System Adminis...
CRMS4_PS_TOOLS054
Maximum date (31.12.9999) reached; no further date increase allowed
What causes this issue? The maximum date (31.12.9999) of the calendar has been reached during the date calculation operation using the Social Service...
CRMS4_PS_TOOLS057
Unable to build period for frequency type &1 / date &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CRMS4_PS_TOOLS058
Check your Customizing settings: SXP type: &1, FrqMType: &2, DDRType: &3
What causes this issue? Required entries are missing or invalid in one or more of the following Customizing activites: Customizing for <LS>Publ...
Click on this link to search all SAP messages.