How To Fix CRM_ICM_OOS018 - Related operation &1 is already assigned to an operation project plan


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CRM_ICM_OOS - ICM: Message Class - Operation Organizational Structure

  • Message number: 018

  • Message text: Related operation &1 is already assigned to an operation project plan

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CRM_ICM_OOS018 - Related operation &1 is already assigned to an operation project plan ?
    The SAP error message CRM_ICM_OOS018 indicates that a specific operation (identified by &1) is already assigned to an operation project plan. This typically occurs in the context of SAP Customer Relationship Management (CRM) when trying to assign an operation to a project plan that is already linked to another project or operation.
    
    Cause: Duplicate Assignment: The operation you are trying to assign is already linked to another project plan or operation. Project Plan Restrictions: The system may have restrictions that prevent the same operation from being assigned to multiple project plans simultaneously. Data Integrity Issues: There may be inconsistencies in the data or configuration that lead to this error.
    Solution: Check Existing Assignments: Review the current assignments of the operation in question. You can do this by navigating to the relevant project plan and checking the operations assigned to it. Use transaction codes like CRMD_ORDER or CRMD_ORDERADM_H to view the details of the operation. Reassign or Remove Existing

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker