Do you have any question about this error?
Message type: E = Error
Message class: CRM_BILLPLAN_UBB - Messages for UBB Billing Plan
Message number: 510
Message text: Combine the last two periods
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CRM_BILLPLAN_UBB510
- Combine the last two periods ?The SAP error message CRM_BILLPLAN_UBB510, which states "Combine the last two periods," typically occurs in the context of billing plans or billing cycles in SAP CRM (Customer Relationship Management). This error indicates that there is an issue with the billing plan configuration, specifically related to the periods defined for billing.
Cause:
- Billing Plan Configuration: The error often arises when the billing plan is set up in such a way that the last two billing periods cannot be processed separately. This can happen if the billing plan is configured to combine the last two periods for billing purposes.
- Period Overlap: There may be an overlap in the billing periods, or the system may not be able to distinguish between the last two periods due to configuration settings.
- Incomplete Data: Missing or incomplete data in the billing plan or related master data can also trigger this error.
Solution:
Review Billing Plan Configuration:
- Go to the billing plan configuration in SAP and check the settings for the billing periods. Ensure that the last two periods are configured correctly and that they are not set to be combined unless intended.
Adjust Billing Periods:
- If the system is set to combine the last two periods, you may need to adjust the billing plan to allow for separate processing of these periods. This can involve changing the billing frequency or the configuration settings.
Check for Overlaps:
- Ensure that there are no overlaps in the billing periods. Each period should be distinct and clearly defined.
Data Consistency:
- Verify that all necessary data related to the billing plan is complete and consistent. This includes checking customer master data, contract details, and any related billing documents.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on billing plan configurations and error messages.
Testing:
- After making changes, test the billing plan to ensure that the error does not reoccur and that the billing process works as expected.
Related Information:
CRMD_ORDER
for managing CRM orders or VF01
for billing document creation.By following these steps, you should be able to resolve the CRM_BILLPLAN_UBB510 error and ensure that your billing plans are configured correctly.
Get instant SAP help. Start your 7-day free trial now.
CRM_BILLPLAN_UBB509
No flow category found
What causes this issue? You tried to accrue/combine periods to assign a single contract to the pool contract. The flow category cannot be found.Syste...
CRM_BILLPLAN_UBB508
No periods to maintain
What causes this issue? You attempted to split/merge billing plan periods, but no period with the specified split/merge date was found.System Respons...
CRM_BILLPLAN_UBB511
Do not merge periods that are de-/assigned to a pool contract
What causes this issue? You are trying to combine two dates which at least one are assigned to a poolcontract.System Response The system issues an e...
CRM_BILLPLAN_UBB512
Assignment to single pool cont. not possible; assign doc. to settl. per.
What causes this issue? You tried to assign a contract to a single poolcontract within a period which is already invoiced.System Response No assign ...
Click on this link to search all SAP messages.