Do you have any question about this error?
Message type: E = Error
Message class: CR - (1,099) Work Center; (100,200) Capacity
Message number: 064
Message text: Selected work center capacity is basis for scheduling
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CR064
- Selected work center capacity is basis for scheduling ?The SAP error message CR064 ("Selected work center capacity is basis for scheduling") typically occurs in the context of production planning and scheduling when there is an issue with the work center's capacity settings. This error indicates that the system is unable to schedule operations because the selected work center's capacity is not properly defined or is not suitable for the scheduling process.
Causes:
- Capacity Not Defined: The work center may not have any capacity defined for the relevant time period.
- Capacity Category Issues: The capacity category assigned to the work center may not be appropriate for the type of scheduling being performed.
- Incorrect Planning Parameters: The planning parameters for the work center may not be set correctly, leading to scheduling conflicts.
- Capacity Overload: The work center may be overloaded with existing orders, preventing new orders from being scheduled.
- Scheduling Type: The scheduling type set for the work center may not align with the requirements of the production order.
Solutions:
Check Work Center Capacity:
- Go to the work center configuration (Transaction code CR02) and verify that the capacity is defined for the relevant period.
- Ensure that the capacity is set up correctly for the required planning horizon.
Review Capacity Categories:
- Ensure that the capacity category assigned to the work center is appropriate for the operations being scheduled.
Adjust Planning Parameters:
- Review and adjust the planning parameters in the work center settings to ensure they align with the production requirements.
Analyze Existing Orders:
- Check for existing production orders that may be consuming the work center's capacity. If necessary, reschedule or release some orders to free up capacity.
Change Scheduling Type:
- If the scheduling type is causing issues, consider changing it to a more suitable option that aligns with your production needs.
Consult Documentation:
- Refer to SAP documentation or help resources for specific details on the work center configuration and scheduling processes.
Related Information:
Transaction Codes:
SAP Notes: Check for any relevant SAP Notes that may address specific issues related to work center capacity and scheduling.
Training and Support: If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
By following these steps, you should be able to identify the root cause of the CR064 error and implement the necessary changes to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CR063
Special character & cannot be the first position
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CR062
Activity type & is not set up for cost center & & in the year &
What causes this issue? You are attempting to allocate activity type &V1& to the work center. However, this activity type has not be set up i...
CR065
Enter base unit of measure with the dimension "time" for scheduling basis
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CR066
Enter a unit of measure for queue time
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.