How To Fix CR062 - Activity type & is not set up for cost center & & in the year &


CR062 - Overview

  • Message type: E = Error

  • Message class: CR - (1,099) Work Center; (100,200) Capacity

  • Message number: 062

  • Message text: Activity type & is not set up for cost center & & in the year &

  • Show details Hide details
  • What causes this issue?

    You are attempting to allocate activity type &V1& to the work center.
    However, this activity type has not be set up in controlling area &V2&
    for cost center &V3& on &V4&.

    How to fix this error?

    Allocate an activity type to the work center that is set up for the cost
    center &V3& on &V4& or
    setup the activity type you want in cost center &V3& within cost center
    accounting to &V4&. Please remember, that both the assignment of a work
    center to a cost center and the allocation of an activity type to a
    cost center have validity periods.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CR062 - Activity type & is not set up for cost center & & in the year & ?
    The SAP error message CR062 indicates that an activity type is not set up for a specific cost center in a given fiscal year. This error typically arises in the context of controlling (CO) when trying to perform activities related to cost centers and activity types, such as planning, posting, or reporting.
    
    Cause: Missing Configuration: The activity type has not been assigned to the cost center in the controlling area for the specified fiscal year. Incorrect Period: The fiscal year or period being referenced may not be correctly set up or may not match the configuration. Inactive Activity Type: The activity type may be inactive or not available for the specified cost center. Cost Center Not Active: The cost center may not be active for the specified fiscal year.
    Solution: Check Activity Type Configuration: Go to the SAP transaction code KP26 (Change Plan Data) or KP06 (Change Plan Data for Cost Centers) and verify if the activity type

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant