How To Fix CR065 - Enter base unit of measure with the dimension "time" for scheduling basis


CR065 - Overview

  • Message type: E = Error

  • Message class: CR - (1,099) Work Center; (100,200) Capacity

  • Message number: 065

  • Message text: Enter base unit of measure with the dimension "time" for scheduling basis

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CR065 - Enter base unit of measure with the dimension "time" for scheduling basis ?
    The SAP error message CR065, which states "Enter base unit of measure with the dimension 'time' for scheduling basis," typically occurs in the context of material master data or production planning when the system expects a time-based unit of measure for scheduling purposes.
    
    Cause: This error arises when the system is configured to require a time-based unit of measure for scheduling, but the unit of measure provided does not meet this requirement. Common scenarios include: Incorrect Unit of Measure: The unit of measure assigned to the material or operation is not a time-based unit (e.g., hours, minutes). Missing Configuration: The scheduling basis in the material master or routing may not be set up correctly to reflect the expected time dimension. Data Entry Error: There may have been a mistake in entering the unit of measure in the relevant fields.
    Solution: To resolve the CR065 error, follow these steps: Check the Material Master: Go to the material master record (transaction

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author