Message type: E = Error
Message class: CPWB - General Workbench Messages
Message number: 300
Message text: ****************** Material Allocation Overview *************************
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CPWB300
- ****************** Material Allocation Overview ************************* ?The SAP error message CPWB300 typically relates to issues in the Material Allocation Overview within the SAP system, particularly in the context of production planning and control. This message can arise in various scenarios, often indicating that there are problems with the allocation of materials to production orders or planned orders.
Cause: Material Shortage: The most common cause is that the required materials for a production order are not available in sufficient quantities. Incorrect Configuration: There may be issues with the configuration of the material master data, such as incorrect settings for availability checks or planning parameters. Planning Run Issues: If the planning run did not execute correctly, it could lead to discrepancies in material availability. Stock Levels: The stock levels may not be updated correctly, leading to a mismatch between the expected and actual availability of materials. Order Status: The status of the production order may not allow for material allocation (e.g., if the order
Get instant SAP help. Sign up for our Free Essentials Plan.
CPWB264
Sequence remains unchanged
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPWB263
Do not enter a sequence number if you want to copy more than one sequence
What causes this issue? You have selected several sequences and want to copy them. You have also entered a sequence number in the context. However, y...
CPWB302
Select material-routing allocation
What causes this issue? Before you can execute the chosen function, you must select at least one material-routing allocation. You have not selected a...
CPWB304
Some selected material-routing assignments are not valid on key date
What causes this issue? You have selected material-routing allocations that are not valid on the key date.System Response The function is not execu...
Click on this link to search all SAP messages.