How To Fix CPWB263 - Do not enter a sequence number if you want to copy more than one sequence


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CPWB - General Workbench Messages

  • Message number: 263

  • Message text: Do not enter a sequence number if you want to copy more than one sequence

  • Show details Hide details
  • What causes this issue?

    You have selected several sequences and want to copy them. You have
    also entered a sequence number in the context. However, you are not
    allowed to create more than one sequence with the same sequence number.

    System Response

    The sequences were not copied.

    How to fix this error?

    Delete the sequence number in the context or select just a single
    sequence.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CPWB263 - Do not enter a sequence number if you want to copy more than one sequence ?

    The SAP error message CPWB263 typically occurs in the context of the SAP Production Planning (PP) module, particularly when working with the capacity planning or production order management functionalities. This error indicates that the user is trying to enter a sequence number while attempting to copy multiple sequences, which is not allowed.

    Cause:

    The error arises when:

    • You are trying to copy multiple sequences in a planning table or a similar interface.
    • You have inadvertently entered a sequence number in the relevant field, which conflicts with the action of copying multiple sequences.

    Solution:

    To resolve the CPWB263 error, follow these steps:

    1. Remove the Sequence Number: If you are copying multiple sequences, ensure that the sequence number field is left blank. This allows the system to process the copying of all selected sequences without any specific sequence number constraint.

    2. Check Your Selection: Make sure that you have selected the correct sequences you want to copy. If you only intend to copy a single sequence, you can enter the sequence number accordingly.

    3. Review Documentation: If you are unsure about the process, refer to the SAP documentation or help files related to the specific transaction or module you are working with. This can provide additional context and guidance.

    4. Consult with Colleagues or SAP Support: If the issue persists or if you are unsure about the correct procedure, consider reaching out to colleagues who are experienced with SAP PP or contacting SAP support for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with the relevant transaction codes in SAP that pertain to capacity planning and production order management, such as C223 (Change Capacity Planning) or CO01 (Create Production Order).
    • SAP Notes: Check for any SAP Notes related to this error message, as they may provide additional insights or patches that could resolve the issue.
    • User Training: If you frequently encounter this error, consider additional training on the SAP PP module to better understand the functionalities and limitations of the system.

    By following these steps, you should be able to resolve the CPWB263 error and continue with your tasks in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant