Do you have any question about this error?
Message type: E = Error
Message class: CPWB - General Workbench Messages
Message number: 302
Message text: Select material-routing allocation
Before you can execute the chosen function, you must select at least
one material-routing allocation. You have not selected a material-
routing allocation.
The chosen function cannot be executed.
Select at least one material-routing allocation.
Error message extract from SAP system. Copyright SAP SE.
CPWB302
- Select material-routing allocation ?The SAP error message CPWB302, which states "Select material-routing allocation," typically occurs in the context of production planning and control, particularly when working with the Capacity Planning Workbench (CPWB) in SAP. This error indicates that the system is unable to find a valid allocation of materials to the routing for the production order or planned order you are trying to process.
Causes:
Missing Material-Routing Allocation: The most common cause is that there is no valid allocation of the material to the routing in the system. This can happen if the routing has not been properly defined or if the material is not assigned to the routing.
Incorrect Configuration: There may be issues with the configuration of the routing or the material master data, leading to a lack of proper linkage.
Data Inconsistencies: There could be inconsistencies in the master data, such as missing or incorrect entries in the material master or routing.
Authorization Issues: Sometimes, the user may not have the necessary authorizations to view or select the material-routing allocation.
Solutions:
Check Material-Routing Assignment:
- Go to the routing transaction (e.g., CA03) and check if the material is correctly assigned to the routing.
- Ensure that the routing is active and valid for the material in question.
Verify Master Data:
- Check the material master data (transaction MM03) to ensure that all necessary information is correctly maintained.
- Ensure that the relevant views (e.g., Basic Data, MRP, Work Scheduling) are properly filled out.
Review Configuration:
- If you have access, review the configuration settings in the Production Planning module to ensure that the settings for material and routing are correctly defined.
Check Authorizations:
- Ensure that the user has the necessary authorizations to access the material and routing data.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on the error message and related processes.
Contact Support:
- If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
By following these steps, you should be able to identify the cause of the CPWB302 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CPWB300
****************** Material Allocation Overview *************************
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPWB264
Sequence remains unchanged
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPWB304
Some selected material-routing assignments are not valid on key date
What causes this issue? You have selected material-routing allocations that are not valid on the key date.System Response The function is not execu...
CPWB305
The last selected material allocation has already been reached
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.