Do you have any question about this error?
Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 206
Message text: Change number & collision with Mat.-routing assignment change status &
During the date shift, the change status of the material routing
assignment which is shifted with change number &V1&, collided with an
existing change status with the change number &V2&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CP206
- Change number & collision with Mat.-routing assignment change status & ?The SAP error message CP206 indicates a conflict between a change number and the material-routing assignment change status. This typically occurs in the context of production planning and control, particularly when dealing with change management in SAP.
Cause:
The error CP206 arises when there is an attempt to make changes to a material or routing that is currently locked or has a change number assigned to it. This can happen in scenarios such as:
To resolve the CP206 error, you can take the following steps:
Check Change Number Status:
Release or Delete Change Number:
Review Change Status:
Consult Documentation:
Contact SAP Support:
By following these steps and understanding the underlying concepts, you should be able to resolve the CP206 error effectively.
Get instant SAP help. Start your 7-day free trial now.
CP205
Change number & exceeds existing change status
What causes this issue? You are attempting to shift change numbers. Change statuses may not "pass" each other because of a shift in the ch...
CP204
Change no. & conflicts with existing change status
What causes this issue? You want to shift change numbers. Change number &V1& interferes with another change status. Change statuses cannot ex...
CP207
Change number &1 exceeds the material-routing assignment change status &2
What causes this issue? During the date shift, the change status of the material-routing assignment, shifted with the change number &, exceeds an...
CP208
Change number & collision with available change number &
What causes this issue? During the date shift, the change status, which is shifted with change number &V1&, collided with an existing change ...
Click on this link to search all SAP messages.