Message type: E = Error
Message class: CO - PPC order processing messages
Message number: 816
Message text: Planned order & is not converted (missing material availability)
The availability control in Customizing specifies that a planned order
may only be converted if all materials are available.
Planned order &V1& was not converted.
You have two options:
Correct the missing part situation.
Change the parameters in Customizing in such a way that conversion is
permitted in spite of missing parts.
<DS:SIMG.SIMG_CFMENUOLPFOPJK>Execute function</>
Error message extract from SAP system. Copyright SAP SE.
CO816
- Planned order & is not converted (missing material availability) ?The SAP error message CO816 indicates that a planned order cannot be converted into a production order due to missing material availability. This typically occurs when the system checks the availability of materials required for the planned order and finds that one or more materials are not available in the required quantity.
Cause: Material Shortage: The required materials for the planned order are not available in stock. Incorrect Material Master Data: The material master data may not be set up correctly, leading to incorrect availability checks. Lead Times: The lead times for procurement or production may not be sufficient to meet the planned order's requirements. Batch Management: If batch management is enabled, the specific batch required may not be available. Stock Type: The stock may be in a non-available status (e.g., blocked stock, quality inspection stock). Planning Parameters: Incorrect planning parameters or settings in the MRP (Material Requirements Planning) configuration.
Solution: Check Material Availability: Use transaction code MD04 (Stock/Requirements
Get instant SAP help. Sign up for our Free Essentials Plan.
CO815
Finish time is earlier than start time
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CO814
Order type & for routing type & in plant & without order category
What causes this issue? Costing uses the order type &V1& which is not defined in customizing for production activity control. This inconsist...
CO817
Planned order & is not converted (missing available capacity)
What causes this issue? The availability control in Customizing specifies that a planned order may only be converted if there is sufficient available...
CO818
Planned order & is not converted (missing PRT availability)
What causes this issue? The availability control in Customizing specifies that a planned order can only be converted if all production resources/tool...