Do you have any question about this error?
Message type: E = Error
Message class: CO - PPC order processing messages
Message number: 816
Message text: Planned order & is not converted (missing material availability)
The availability control in Customizing specifies that a planned order
may only be converted if all materials are available.
Planned order &V1& was not converted.
You have two options:
Correct the missing part situation.
Change the parameters in Customizing in such a way that conversion is
permitted in spite of missing parts.
<DS:SIMG.SIMG_CFMENUOLPFOPJK>Execute function</>
Error message extract from SAP system. Copyright SAP SE.
CO816
- Planned order & is not converted (missing material availability) ?The SAP error message CO816 indicates that a planned order cannot be converted into a production order due to missing material availability. This typically occurs when the system checks the availability of materials required for the planned order and finds that one or more materials are not available in the required quantity.
Cause:
- Material Shortage: The required materials for the planned order are not available in stock.
- Incorrect Material Master Data: The material master data may not be set up correctly, leading to incorrect availability checks.
- Lead Times: The lead times for procurement or production may not be sufficient to meet the planned order's requirements.
- Batch Management: If batch management is enabled, the specific batch required may not be available.
- Stock Type: The stock may be in a non-available status (e.g., blocked stock, quality inspection stock).
- Planning Parameters: Incorrect planning parameters or settings in the MRP (Material Requirements Planning) configuration.
Solution:
- Check Material Availability: Use transaction code MD04 (Stock/Requirements List) to check the availability of the materials required for the planned order. Ensure that the required quantities are available.
- Adjust Stock Levels: If materials are short, consider purchasing or producing the required materials to fulfill the planned order.
- Review Material Master Data: Ensure that the material master data is correctly maintained, including the MRP views and availability check settings.
- Check Lead Times: Review the lead times for procurement and production to ensure they are adequate for the planned order.
- Batch Management: If applicable, check the batch status and ensure that the required batch is available.
- Review MRP Settings: Check the MRP settings and parameters to ensure they are configured correctly for your planning needs.
- Re-run MRP: If changes are made to stock levels or material data, re-run the MRP to update the planned orders and availability.
Related Information:
By following these steps, you should be able to identify the cause of the CO816 error and take appropriate actions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CO815
Finish time is earlier than start time
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CO814
Order type & for routing type & in plant & without order category
What causes this issue? Costing uses the order type &V1& which is not defined in customizing for production activity control. This inconsist...
CO817
Planned order & is not converted (missing available capacity)
What causes this issue? The availability control in Customizing specifies that a planned order may only be converted if there is sufficient available...
CO818
Planned order & is not converted (missing PRT availability)
What causes this issue? The availability control in Customizing specifies that a planned order can only be converted if all production resources/tool...
Click on this link to search all SAP messages.