Message type: E = Error
Message class: CO - PPC order processing messages
Message number: 639
Message text: Please carry out (multi-level) planning run for material & first
The planned order cannot be converted as the related order network is
not complete. A planned order was not created for the secondary
requirement for the directly manufactured components.
This can be done using multi-level material requirements planning.
Start multi-level material requirements planning for the planned order
material.
If conversion is still not possible after multi-level planning,
investigate the following:
Was the order network planned successfully, or did the program
terminate during planning? Check the termination MRP lists.
Check whether the material master for the directly manufactured
assemblies is maintained correctly. The MRP type should be set so that
the material is planned (meaning that it should not be set to 'ND').
Dependent requirements should be relevant for planning.
If there is a fixed planned order for an assembly in the order network
for which the order quantity is different to the quantity of the
initiating secondary requirement? If so, deselect the indicator for
fixing the planned order, or adjust the quantity and then carry out
planning again.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CO639
- Please carry out (multi-level) planning run for material & first ?The SAP error message CO639 typically indicates that a multi-level planning run has not been executed for a specific material or that the planning run needs to be carried out in a certain sequence. This error often arises in the context of production planning and control, particularly when dealing with materials that have dependencies or require a specific planning sequence.
Cause: Missing Planning Run: The material in question has not undergone a multi-level planning run, which is necessary for the system to generate the required planning data. Incorrect Sequence: The planning run may need to be executed in a specific order, especially if there are dependencies between materials (e.g., parent-child relationships in BOMs). Master Data Issues: There may be issues with the material master data, such as missing BOMs or routing information. Planning Parameters: The planning parameters for the material may not be set correctly, preventing the system from executing the planning run.
Solution: Execute Multi-Level Planning
Get instant SAP help. Sign up for our Free Essentials Plan.
CO638
Order category & not in table TCO09 (text IDs)
What causes this issue? The order type you entered could not be found in the table TCO09 (Text IDs).System Response The action is not executed.How t...
CO637
Intra materials cannot be costed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CO640
Work center & is only permitted up to release
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CO641
Realistic delivery date & ? (please check)
What causes this issue? The delivery date calculated using the <GL:planned_delivery_time>planned delivery time</> and the <GL:goods_re...