How To Fix CO562 - No capacity exists for capacity category & for work center &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CO - PPC order processing messages

  • Message number: 562

  • Message text: No capacity exists for capacity category & for work center &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CO562 - No capacity exists for capacity category & for work center & ?

    The SAP error message CO562 indicates that there is no available capacity for a specific capacity category at a given work center. This error typically arises during production planning or when trying to schedule operations in a work center where the available capacity does not meet the requirements of the planned orders or production orders.

    Cause:

    1. Capacity Overload: The work center is already fully booked with other production orders, and there is no remaining capacity to accommodate the new order.
    2. Incorrect Capacity Planning: The capacity planning settings for the work center may not be configured correctly, leading to an inaccurate representation of available capacity.
    3. Capacity Category Misconfiguration: The capacity category being referenced may not be set up correctly in the work center or may not match the requirements of the operation.
    4. Time Period Issues: The time period for which the capacity is being checked may not align with the planned order's start and finish dates.
    5. Resource Availability: The resources (machines, labor, etc.) associated with the work center may not be available due to maintenance, breakdowns, or other reasons.

    Solution:

    1. Check Work Center Capacity: Review the capacity planning for the work center in transaction code CR01 or CR02. Ensure that the available capacity is sufficient for the planned orders.
    2. Adjust Production Orders: If the work center is overloaded, consider rescheduling or adjusting the production orders to free up capacity.
    3. Review Capacity Categories: Ensure that the capacity categories are correctly defined and that they match the requirements of the operations being scheduled.
    4. Check Time Periods: Verify that the time periods for the planned orders align with the available capacity in the work center.
    5. Resource Management: Ensure that all resources associated with the work center are available and not blocked due to maintenance or other issues.
    6. Capacity Evaluation: Use transaction code CM01 (Capacity Evaluation) to analyze the capacity situation and identify any bottlenecks.

    Related Information:

    • Transaction Codes:
      • CR01/CR02: Create/Change Work Center
      • CM01: Capacity Evaluation
      • COHV: Mass Processing of Production Orders
    • Capacity Planning: Understanding how capacity planning works in SAP can help in configuring work centers and capacity categories effectively.
    • Production Planning (PP) Module: Familiarity with the PP module in SAP can provide insights into how production orders are scheduled and how capacity is managed.

    By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the CO562 error and ensure that your production scheduling runs smoothly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker