How To Fix CN_ECP_PS023 - Enter a valid costing variant


CN_ECP_PS023 - Overview

  • Message type: E = Error

  • Message class: CN_ECP_PS -

  • Message number: 023

  • Message text: Enter a valid costing variant

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


CN_ECP_PS023 - Details

  • The SAP error message CN_ECP_PS023: "Enter a valid costing variant" typically occurs in the context of project system (PS) or controlling (CO) modules when a user attempts to perform an action that requires a costing variant, but the system cannot find a valid one.
    
    Cause: Missing Costing Variant: The costing variant may not be defined in the system or may not be assigned to the project or order. Incorrect Configuration: The configuration settings for the costing variant may be incorrect or incomplete. Authorization Issues: The user may not have the necessary authorizations to access the costing variant. Project Settings: The project or order may not be set up correctly to use the specified costing variant.
    Solution: Check Costing Variant Configuration: Go to the configuration settings in SAP (Transaction code: SPRO). Navigate to Controlling > Costing > Costing Variants and ensure that the costing variant you are trying to use is defined and configured correctly. Assign Costing Variant: Ensure that the costing

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


CN_ECP_PS023 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author