Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 498
Message text: Change not accepted (execution factor in network too large)
Due to the change in quantity, the execution factor in the network is
too large.
The maximum execution factor is 999.
The system cannot accept the change in quantity.
Check the quantity structure in the network.
Error message extract from SAP system. Copyright SAP SE.
CN498
- Change not accepted (execution factor in network too large) ?The SAP error message CN498 ("Change not accepted (execution factor in network too large)") typically occurs in the context of project management and network scheduling within SAP's Project System (PS) module. This error indicates that the execution factor for a network activity exceeds the allowable limits set in the system.
Cause:
The error is usually caused by one of the following factors:
- Execution Factor Exceeds Limits: The execution factor (which can be a percentage of completion or a similar metric) for a network activity is set too high, surpassing the maximum allowable value defined in the system.
- Incorrect Data Entry: There may be incorrect or unrealistic data entered for the activity, such as an overly high duration or resource allocation.
- Configuration Settings: The system configuration may have limits set that are too restrictive for the current project requirements.
Solution:
To resolve the CN498 error, you can take the following steps:
Check Execution Factor: Review the execution factor for the network activity in question. Ensure that it is within the acceptable range. If it is too high, adjust it to a more realistic value.
Review Activity Data: Examine the data entered for the network activity, including duration, resources, and dependencies. Make sure all values are realistic and within the expected limits.
Adjust Configuration Settings: If necessary, consult with your SAP administrator or configuration team to review the settings related to execution factors in the system. They may need to adjust the limits if they are too restrictive for your project needs.
Recalculate the Network: After making adjustments, recalculate the network to ensure that all changes are reflected and that the error does not persist.
Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on execution factors and network planning to ensure compliance with best practices.
Related Information:
If the issue persists after following these steps, it may be beneficial to engage with SAP support or your internal IT team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CN497
Execution factor must be an integer multiple of the header factor (&)
What causes this issue? The execution factor in the activity must be an integer multiple of the execution factor in the network header (&V1&)...
CN496
Execution factor for activity & network & becoming too large - check
What causes this issue? If the system multipies the execution factor in the header of network &V2& by the execution factor in activity &...
CN499
Costs of activity & becoming too large - please check
What causes this issue? If the system multipies the execution factor in activity &V1& by the costs, the product is too large.System Response ...