Do you have any question about this error?
Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 497
Message text: Execution factor must be an integer multiple of the header factor (&)
The execution factor in the activity must be an integer multiple of the
execution factor in the network header (&V1&).
INCLUDE 'NA_ALLG_NOFUNKTION' OBJECT DOKU ID TX
Change the execution factor.
Error message extract from SAP system. Copyright SAP SE.
CN497
- Execution factor must be an integer multiple of the header factor (&) ?The SAP error message CN497 indicates that there is a mismatch between the execution factor and the header factor in a network or activity within a project. This error typically arises in the context of project management and controlling, particularly when dealing with network activities in SAP's Project System (PS) module.
Cause:
The error occurs when the execution factor (the quantity or amount of work to be performed) is not an integer multiple of the header factor (the base quantity defined at the header level of the network or activity). This can happen in scenarios such as:
- Incorrect Configuration: The execution factor is set to a value that does not align with the header factor.
- Data Entry Errors: Manual entry of values that do not conform to the expected multiples.
- Changes in Project Structure: Modifications to the project structure or network that lead to inconsistencies in the factors.
Solution:
To resolve the CN497 error, you can take the following steps:
Check Header Factor: Review the header factor of the network or activity. Ensure that it is set correctly and reflects the intended base quantity.
Adjust Execution Factor: Modify the execution factor to ensure it is an integer multiple of the header factor. For example, if the header factor is 10, valid execution factors would be 10, 20, 30, etc.
Review Activity Settings: Go through the settings of the specific activity or network where the error occurred. Ensure that all related parameters are correctly configured.
Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on how to set up factors in the Project System.
Testing: After making adjustments, test the changes by attempting to execute the process again to ensure that the error is resolved.
Seek Help: If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert who can provide more tailored assistance.
Related Information:
By following these steps, you should be able to identify the cause of the CN497 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CN496
Execution factor for activity & network & becoming too large - check
What causes this issue? If the system multipies the execution factor in the header of network &V2& by the execution factor in activity &...
CN495
Quantity in activity & element & is too large - check
What causes this issue? When you multiply using the execution factor in activity &V1&, you get a value for the activity quantity in activity ...
CN498
Change not accepted (execution factor in network too large)
What causes this issue? Due to the change in quantity, the execution factor in the network is too large. The maximum execution factor is 999.System R...
CN499
Costs of activity & becoming too large - please check
What causes this issue? If the system multipies the execution factor in activity &V1& by the costs, the product is too large.System Response ...
Click on this link to search all SAP messages.