Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 500
Message text: Network & is being created
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message CN500 typically indicates that there is an issue related to the creation of a network in the SAP system. This error can occur in the context of project management, particularly when dealing with networks in the Project System (PS) module.
Cause: The CN500 error message can be triggered by several factors, including: Missing or Incorrect Data: Required fields or data might be missing or incorrectly filled out in the network creation screen. Authorization Issues: The user may not have the necessary authorizations to create a network.
Configuration Issues: There may be configuration settings in the Project System that are not set up correctly. System Errors: There could be temporary system issues or inconsistencies in the database.
Solution: To resolve the CN500 error, you can take the following steps: Check Required Fields: Ensure that all mandatory fields in the network creation screen are filled out correctly. This includes checking for valid dates, activity types, and other
Get instant SAP help. Sign up for our Free Essentials Plan.
CN499 Costs of activity & becoming too large - please check
What causes this issue? If the system multipies the execution factor in activity &V1& by the costs, the product is too large.System Response ...
CN498 Change not accepted (execution factor in network too large)
What causes this issue? Due to the change in quantity, the execution factor in the network is too large. The maximum execution factor is 999.System R...
CN501 Network & was changed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN502 You do not have authorization to change milestone &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.