Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 070
Message text: WBS elem. cntrl. area & is not same as act. elem. cntr. area &
Controlling area of the WBS element (&V1) must agree with the
controlling area of the activity element (&V2&). The must both have the
same controlling area before you can assign an activity element to a
WBS element.
INCLUDE 'NA_ALLG_ORGELEM' OBJECT DOKU ID TX
INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TX
INCLUDE 'NA_ALLG_VORGEHEN' OBJECT DOKU ID TX
Check the organizational data in Customizing and make any necessary
changes.
Assign controlling area -> company code
Assign plant -> company code
Error message extract from SAP system. Copyright SAP SE.
CN070
- WBS elem. cntrl. area & is not same as act. elem. cntr. area & ?The SAP error message CN070 indicates that there is a mismatch between the controlling area of a Work Breakdown Structure (WBS) element and the controlling area of the actual cost element. This error typically arises in the context of project management and controlling in SAP, particularly when dealing with internal orders, projects, or cost centers.
Cause:
The error occurs when:
- The WBS element is assigned to a controlling area that is different from the controlling area of the actual cost element being used in a transaction.
- There may be inconsistencies in the configuration of the controlling areas or the assignment of the WBS elements to the respective controlling areas.
Solution:
To resolve the CN070 error, you can take the following steps:
Check WBS Element Assignment:
- Go to the WBS element in question and verify its controlling area assignment. You can do this by navigating to the WBS element in the Project System (PS) module and checking its details.
Check Cost Element Assignment:
- Verify the controlling area of the actual cost element that is being used in the transaction. Ensure that it matches the controlling area of the WBS element.
Adjust Configurations:
- If there is a mismatch, you may need to adjust the configuration settings in the SAP system. This could involve changing the controlling area of the WBS element or ensuring that the cost elements are correctly assigned to the appropriate controlling area.
Review Project Structure:
- Ensure that the project structure is correctly set up and that all elements are assigned to the correct controlling area.
Consult Documentation:
- Review SAP documentation or consult with your SAP support team for specific guidance on how to handle controlling area assignments.
Testing:
- After making the necessary adjustments, perform a test transaction to ensure that the error has been resolved.
Related Information:
If the issue persists after following these steps, it may be beneficial to engage with your SAP support team or a consultant who specializes in SAP Project System and Controlling modules for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CN069
WBS elem. cntrl. area & is not same as activity cntrl. area &
What causes this issue? Controlling area of the WBS element (&V1) does not agree with the controlling area of the activity (&V2&). They m...
CN068
WBS elem. cntrl. area & is not same as network cntrl. area &
What causes this issue? The WBS element's controlling area &V1& does not agree with the network's controlling area &V2&. Th...
CN071
Activity can only differ between internal and external processing
What causes this issue? The company code determined by the plant in the activity element does not agree with the company code of the activity.System ...
CN072
Plant & is not assigned to company code & of activity
What causes this issue? The plant to which the material is allocated, is different from the plant in the activity and is not allocated to the company...
Click on this link to search all SAP messages.