Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 049
Message text: ------ Error messages for organization elements -------------------------
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message CN049 typically indicates an issue related to organizational elements in the context of project management or controlling. This error can arise in various scenarios, such as when trying to create or modify a project, cost center, or other organizational structures.
Cause: The CN049 error message usually occurs due to one of the following reasons: Missing Organizational Elements: The organizational element you are trying to use (like a cost center, internal order, or project) may not be defined in the system. Incorrect Configuration: There may be a configuration issue in the system where the organizational elements are not properly set up or linked. Authorization Issues: The user may not have the necessary authorizations to access or modify the organizational elements. Inactive Status: The organizational element might be inactive or not available for the period you are trying to use it.
Solution: To resolve the CN049 error, you can take the following steps: Check Organizational Elements: Verify that
Get instant SAP help. Sign up for our Free Essentials Plan.
CN048
The status of the network '&' does not permit changes
What causes this issue? You want to change the network but the network has one of the folowing statuses: <LS>locked</> <ls>technica...
CN047
Control key of superior activity is not changed
What causes this issue? The subnetwork assignment was deleted. If the control key of the superior activity was changed when creating a subnetwork, th...
CN050
Control key not available for external processing
What causes this issue? The control key has either not been defined or no indicator has been maintained for external processing.System Response INCL...
CN051
Control key not available for costs
What causes this issue? The control key does not exist for the general costs activity or there has been no indicator maintained for costs.System Resp...