Do you have any question about this error?
Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 044
Message text: An assignment to a standard WBS element already exists
You have created a network by copying from a standard network. The
standard network is assigned to a standard WBS.
However, at the same time, you have made your own assignments to WBS
elements.
When you manually make assignments to WBS elements, the system does not
necessarily take the asignments in the standard stuctures into account.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
When you call up the function <ls>replace standard WBS</> or when youError message extract from SAP system. Copyright SAP SE.
CN044
- An assignment to a standard WBS element already exists ?The SAP error message CN044 ("An assignment to a standard WBS element already exists") typically occurs when you attempt to assign a cost element or a transaction to a Work Breakdown Structure (WBS) element that already has an existing assignment. This can happen in various scenarios, such as when trying to create a new assignment or when attempting to post costs to a WBS element that is already linked to another project or cost object.
Cause:
- Existing Assignment: The WBS element you are trying to assign to already has an existing assignment, which prevents you from making a new one.
- Incorrect Configuration: There may be configuration settings in the project system that restrict multiple assignments to the same WBS element.
- Data Entry Error: The user may have mistakenly tried to assign the same cost element or transaction multiple times.
Solution:
Check Existing Assignments:
- Use transaction codes like
CJ20N
(Project Builder) orCJI3
(Project Actual Line Items) to review the existing assignments to the WBS element.- Identify if the WBS element is already assigned to another project or cost object.
Modify or Remove Existing Assignment:
- If the existing assignment is no longer needed, you can remove it or modify it as necessary.
- Ensure that any changes comply with your organization's project management policies.
Use a Different WBS Element:
- If the WBS element is already in use and cannot be modified, consider using a different WBS element for your assignment.
Consult with Project Management:
- If you are unsure about the existing assignments or the implications of changing them, consult with your project manager or the team responsible for project management.
Check Configuration Settings:
- If you have the necessary permissions, review the configuration settings in the Project System (PS) module to ensure that they allow for the desired assignments.
Related Information:
CJ20N
, CJI3
, CJ02
(Change WBS Element), and CJ01
(Create WBS Element).If the issue persists after following these steps, it may be beneficial to reach out to your SAP support team or consult with an SAP expert for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CN043
Network is not assigned to a profit center
What causes this issue? Profit center accounting is active for controlling area &V1&. However the network is not assigned to a profit center....
CN042
Enter a network number
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN045
No possible entries for network number
What causes this issue? You want to copy a network. Since external number assignment has been activated for networks in Customizing, you could have t...
CN046
Control key "&" from network profile "&" is copied
What causes this issue? The subnetwork assignment was deleted. If the control key of the superior activity &V3&/&V4& was changed when...