How To Fix CN043 - Network is not assigned to a profit center


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CN - Meldungen für Netzpläne

  • Message number: 043

  • Message text: Network is not assigned to a profit center

  • Show details Hide details
  • What causes this issue?

    Profit center accounting is active for controlling area &V1&. However
    the network is not assigned to a profit center.

    System Response

    How to fix this error?

    Enter a profit center.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CN043 - Network is not assigned to a profit center ?

    The SAP error message CN043, which states "Network is not assigned to a profit center," typically occurs in the context of project systems (PS) or controlling (CO) modules when you are trying to perform an action related to a network that has not been properly assigned to a profit center. This can happen during various processes, such as posting costs or creating reports.

    Cause:

    1. Missing Profit Center Assignment: The network in question does not have a profit center assigned to it. This is often required for cost tracking and reporting purposes.
    2. Configuration Issues: There may be configuration issues in the project system or controlling settings that prevent the assignment of a profit center to the network.
    3. Master Data Issues: The master data for the network or related objects (like activities or WBS elements) may not be set up correctly.

    Solution:

    1. Assign a Profit Center:

      • Navigate to the network in question using transaction code CN22 (Change Network).
      • Check the details of the network and look for the profit center field.
      • If the profit center is not assigned, you can assign it directly in the network details.
    2. Check WBS Element:

      • If the network is linked to a WBS element, ensure that the WBS element has a profit center assigned. You can check this using transaction code CJ02 (Change WBS Element).
      • If the WBS element does not have a profit center, assign one.
    3. Review Configuration:

      • Ensure that the configuration settings for project systems and controlling are correctly set up to allow profit center assignments. This may involve checking the settings in the IMG (Implementation Guide) under Project System and Controlling.
    4. Master Data Review:

      • Review the master data for the network and related objects to ensure that all necessary fields are filled out correctly.
    5. Consult Documentation:

      • If you are unsure about the configuration or assignment process, refer to SAP documentation or consult with your SAP support team for guidance.

    Related Information:

    • Transaction Codes:

      • CN22: Change Network
      • CJ02: Change WBS Element
      • CJ20N: Project Builder (to view and manage projects and networks)
    • SAP Notes: Check for any relevant SAP Notes that might address specific issues related to this error message.

    • User Roles and Authorizations: Ensure that the user has the necessary authorizations to make changes to networks and profit centers.

    By following these steps, you should be able to resolve the CN043 error and ensure that your networks are properly assigned to profit centers for accurate cost tracking and reporting.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author