Do you have any question about this error?
Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 046
Message text: Control key "&" from network profile "&" is copied
The subnetwork assignment was deleted.
If the control key of the superior activity &V3&/&V4& was changed when
creating a subnetwork, the control key from the profile is used.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CN046
- Control key "&" from network profile "&" is copied ?The SAP error message CN046 indicates that there is an issue with the control key associated with a network profile in the Project System (PS) module. This error typically arises when the control key specified in the network profile is not valid or is not set up correctly in the system.
Cause:
- Invalid Control Key: The control key specified in the network profile does not exist or is not valid in the system.
- Configuration Issues: The control key may not be properly configured in the system, or it may not be assigned to the correct project or network profile.
- Copying Issues: The error can occur when trying to copy a network or project that has an invalid control key.
Solution:
Check Control Key Configuration:
- Go to the transaction code
OPUK
(Control Key Configuration) to verify if the control key exists and is correctly configured.- Ensure that the control key is assigned to the appropriate network profile.
Review Network Profile:
- Check the network profile settings to ensure that the control key is correctly assigned.
- You can do this by navigating to the transaction code
CN21
(Create Network) orCN22
(Change Network) and reviewing the network profile settings.Correct the Control Key:
- If the control key is incorrect, update it to a valid control key that is configured in the system.
- If necessary, create a new control key that meets the requirements of your project.
Check Project Settings:
- Ensure that the project settings are correctly configured and that the control key is compatible with the project type.
Consult Documentation:
- Refer to SAP documentation or help resources for more information on control keys and their configurations.
Related Information:
OPUK
: Control Key ConfigurationCN21
: Create NetworkCN22
: Change NetworkCN41
: Display NetworkIf the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or refer to SAP Notes for any known issues related to this error message.
Get instant SAP help. Start your 7-day free trial now.
CN045
No possible entries for network number
What causes this issue? You want to copy a network. Since external number assignment has been activated for networks in Customizing, you could have t...
CN044
An assignment to a standard WBS element already exists
What causes this issue? You have created a network by copying from a standard network. The standard network is assigned to a standard WBS. However, a...
CN047
Control key of superior activity is not changed
What causes this issue? The subnetwork assignment was deleted. If the control key of the superior activity was changed when creating a subnetwork, th...
CN048
The status of the network '&' does not permit changes
What causes this issue? You want to change the network but the network has one of the folowing statuses: <LS>locked</> <ls>technica...
Click on this link to search all SAP messages.