How To Fix CMS_RE091 - External Layout Cost cannot be greater than 100%


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CMS_RE - Message class for CMS Real Estate Add On

  • Message number: 091

  • Message text: External Layout Cost cannot be greater than 100%

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CMS_RE091 - External Layout Cost cannot be greater than 100% ?
    The SAP error message CMS_RE091 indicates that the external layout cost for a particular resource or activity in the Controlling (CO) module cannot exceed 100%. This error typically arises in the context of cost planning or budgeting, where the system is enforcing a rule that the total cost allocation for a resource must not exceed the total available budget or capacity.
    
    Cause: Cost Allocation Exceeds 100%: The primary cause of this error is that the sum of the external layout costs assigned to a resource exceeds 100%. This can happen if multiple cost elements or activities are incorrectly configured or if there is a miscalculation in the cost distribution. Incorrect Configuration: There may be an issue with how the external layout costs are set up in the system, such as incorrect percentages or values being entered. Data Entry Errors: Manual data entry errors can lead to incorrect cost percentages being assigned.
    Solution: Review Cost Allocations: Check

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author