How To Fix CMS_RE089 - Percentage building completion cannot be greater than 100%


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CMS_RE - Message class for CMS Real Estate Add On

  • Message number: 089

  • Message text: Percentage building completion cannot be greater than 100%

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CMS_RE089 - Percentage building completion cannot be greater than 100% ?

    The SAP error message CMS_RE089, which states "Percentage building completion cannot be greater than 100%," typically occurs in the context of project management or construction-related modules within SAP, such as SAP Project System (PS) or SAP Real Estate Management (RE).

    Cause:

    This error arises when a user attempts to enter a percentage of completion for a project, building, or construction activity that exceeds 100%. In SAP, the percentage of completion is a critical metric used for tracking progress, and logically, it cannot exceed 100% as this would imply that the project is more than fully completed.

    Common Scenarios Leading to the Error:

    1. Manual Entry Error: A user may have mistakenly entered a value greater than 100% in the completion percentage field.
    2. Data Migration Issues: If data has been migrated from another system, there may be inconsistencies or incorrect values that exceed the allowed limits.
    3. Calculation Errors: If the percentage is calculated based on other inputs, there may be an error in the underlying calculations leading to an inflated percentage.
    4. Configuration Issues: There may be issues with the configuration of the project or building settings that allow for incorrect percentage entries.

    Solution:

    To resolve the CMS_RE089 error, follow these steps:

    1. Check Input Values: Review the percentage completion value you are trying to enter. Ensure it is within the valid range (0% to 100%).

    2. Review Related Data: If the percentage is calculated based on other data, check the source data for any discrepancies that might lead to an inflated percentage.

    3. Adjust Project Status: If the project or building is indeed complete, ensure that the status is updated correctly in the system. You may need to mark it as "Completed" rather than entering a percentage greater than 100%.

    4. Data Validation: If the error is due to data migration, validate the data to ensure that all entries conform to the expected formats and ranges.

    5. Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on managing project completion percentages.

    6. Contact Support: If the issue persists and you cannot identify the cause, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that might address this specific error or provide additional context.
    • User Training: Ensure that users are trained on how to correctly enter and manage project completion percentages to avoid future errors.
    • System Configuration: Review the configuration settings in the SAP system related to project management and completion tracking to ensure they are set up correctly.

    By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.