How To Fix CM113 - This component is not allocated to an operation.


CM113 - Overview

  • Message type: E = Error

  • Message class: CM - Task list messages: Material component allocations

  • Message number: 113

  • Message text: This component is not allocated to an operation.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CM113 - This component is not allocated to an operation. ?
    The SAP error message CM113 ("This component is not allocated to an operation") typically occurs in the context of production planning and control, particularly when working with production orders or process orders. This error indicates that a specific component (material) is not assigned to any operation within the routing or production order.
    Causes:
    
    Missing Allocation: The component has not been allocated to any operation in the routing or production order.
    Incorrect Routing: The routing used for the production order does not include the component in question.
    Changes in Routing: If the routing was changed after the production order was created, the component may not be included in the updated routing.
    Component Not Defined: The component may not be defined in the bill of materials (BOM) for the material being produced.
    Order Type Issues: The order type may not support the allocation of the component.
    
    Solutions:
    
    Check Routing: Verify that the routing for the production order includes the component.

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant